TITAN ANDES GOLD
Titan Andes Gold is Conexiones Trasandinas’ flagship project. The 47.5 km² continuous gold land position in La Paz, Bolivia provides a scalable platform for systematic exploration. The Company is advancing the project through a phased, milestone-based approach focused on technical validation, target definition and responsible stakeholder alignment.
- Jurisdiction: La Paz, Bolivia
- Land Position: 47.5 km² (Continuous Block)
- Stage: Early Exploration
- Commodity: Gold
HIGHLIGHTS
- Scale & Continuity Large, continuous land position supporting systematic exploration and target expansion.
- Prospective Geological Setting Located within a historically gold-bearing region, with indications of mineralization associated with legacy artisanal activity and broad mineralized corridors.
- Data-Driven Targeting Early-stage evaluation integrates technical compilation and AI-supported interpretation to support target screening and prioritization.
- Clear Advancement Framework Phased work planning designed to progress from desktop validation to field verification and, ultimately, drill-target definition as milestones are achieved.
WORK TO DATE
- - Desktop study, historical data compilation and initial technical review
- - Remote sensing and AI-supported interpretation to support target screening
- - Initial project-level planning, including phased work program design
- - Early stakeholder engagement planning aligned with responsible project advancement
NEXT STEPS
- - Field reconnaissance and geological mapping to validate priority areas
- - Initial surface verification activities, including sampling where appropriate
- - Target refinement and ranking based on field results
- - Definition of drill-ready targets and preparation for potential initial drill testing, subject to results and stakeholder alignment
IMPERIUM ANDES GOLD
Imperium Andes Gold is a strategic gold project within Conexiones Trasandinas’ Bolivia portfolio. The project covers approximately 20 km² in La Paz and is being advanced through an early-stage exploration program focused on target definition and milestone-based progression within a prospective, historically gold-bearing region.
- Jurisdiction: La Paz, Bolivia
- Project Area: approximately 20 km²
- Stage: Exploration (early-stage)
- Commodity: Gold
HIGHLIGHTS
- Focused Project Scale Approximately 20 km² project area designed for systematic target definition and efficient follow-up.
- Prospective Geological Setting Located within a historically gold-bearing region, supporting a strong geological rationale for target generation.
- Data-Driven Targeting Early-stage work integrates technical compilation and AI-supported interpretation to support target screening and prioritization.
- Clear Advancement Framework Phased work planning designed to progress from desktop validation to field verification and drill-target definition as milestones are achieved.
WORK TO DATE
- - Desktop study, historical data compilation and initial technical review
- - Remote sensing and AI-supported interpretation to support target screening
- - Initial project-level planning, including phased work program design
- - Early stakeholder engagement planning aligned with responsible project advancement
NEXT STEPS
- - Field reconnaissance and geological mapping to validate priority areas
- - Initial surface verification activities, including sampling where appropriate
- - Target refinement and ranking based on field results
- - Definition of drill-ready targets and preparation for potential initial drill testing, subject to results and stakeholder alignment
SENTINEL GOLD RESOURCES
Sentinel Gold Resources is an alluvial gold project in La Paz, Bolivia, designed around a hydraulic dredging concept. The project is being advanced through a structured pre-implementation program focused on operational readiness, defined equipment specifications and responsible operating practices intended to support controlled alluvial activity and minimize environmental disturbance prior to deployment.
- Jurisdiction: La Paz, Bolivia
- Stage: Pre-implementation
- Commodity: Gold
- Project Area: approximately 2 km²
- Project Type: Alluvial gold, hydraulic dredge
HIGHLIGHTS
- Hydraulic Dredge Concept Hydraulic dredge configuration designed to support controlled material handling and a more managed operating footprint.
- Defined Project Footprint Approximately 2 km² project area supporting focused implementation planning and operational oversight.
- Operational Readiness Focus Pre-implementation work is centered on mobilization planning, operating procedures and phased deployment milestones.
- Environmental Management Orientation Operating concept incorporates practical environmental controls intended to support responsible alluvial operations and reduce unnecessary disturbance.
WORK TO DATE
- - Operating model definition and pre-implementation planning
- - Engineering definition of the hydraulic dredge concept and equipment specifications
- - Preliminary logistics and deployment planning
- - Stakeholder engagement planning aligned with responsible alluvial operations
- - Milestone planning to support operational readiness
NEXT STEPS
- - Finalize deployment plan, operating procedures and environmental control measures
- - Advance stakeholder alignment and required approvals for implementation
- - Mobilize and commission equipment on site, subject to applicable approvals
- - Initiate phased operations and monitoring once commissioning milestones are achieved
AURUM ANDES MINING
Aurum Andes Mining is an alluvial gold project in La Paz, Bolivia, designed around a mechanical dredging concept. The project is being advanced through a structured pre-implementation program focused on operational readiness, defined equipment specifications and responsible stakeholder alignment prior to deployment.
- Jurisdiction: La Paz, Bolivia
- Stage: Pre-implementation
- Commodity: Gold
- Project Area: 1 km²
- Project Type: Alluvial gold, mechanical dredge
HIGHLIGHTS
- Mechanical Dredge Concept Engineered mechanical dredge configuration with defined equipment specifications intended to support controlled alluvial operations.
- Defined Project Footprint Approximately 1 km² project area supporting focused implementation planning and operational oversight.
- Execution Readiness Focus Pre-implementation work is centered on mobilization planning, operating procedures and phased deployment milestones.
- Responsible Operating Approach Planning incorporates stakeholder alignment and appropriate environmental and operational controls for alluvial activity.
WORK TO DATE
- - Operating model definition and pre-implementation planning
- - Engineering definition of the mechanical dredge concept and equipment specifications
- - Stakeholder engagement planning aligned with responsible alluvial operations
- - Milestone planning to support operational readiness
NEXT STEPS
- - Finalize deployment plan, operating procedures and control measures
- - Advance stakeholder alignment and required approvals for implementation
- - Mobilize and commission equipment on site, subject to applicable approvals
- - Initiate phased operations and performance monitoring once commissioning milestones are achieved